Wastewater treatment plant upgrade programme
- Source
- [State water authority] · Government
- Location
- Selangor
- Timing
- Closes 15 Jan 2027
Summary
Secretariat summary of the announcement in two or three sentences: who is asking, what for, and the timeline. Written in our own words.
Read the original announcementNeed meets capability
What the Malaysian side is asking for, paired with Norwegian strengths that answer it.
Malaysian needNorwegian capability
Reduce sludge volumeDisposal costs and landfill limits at regional plants.
Sludge treatment technologyThermal and biological processes proven in Nordic plants.
Recover energy on siteLower operating cost and emissions per plant.
Biogas and energy recoveryProcess integration and heat reuse.
Monitor performance remotelyFewer site visits, faster fault response.
Digital process controlSensors, analytics and operator tools.
Suggested next steps
- Read the tender documents and eligibility requirements at the source.
- Express interest through the council so the secretariat can introduce you to local partners.
- Check whether a Malaysian joint-venture partner or local registration is required.
